Report an accessibility problem

eSpace engineering design, integration and prototyping studio

Join us on Wednesday, May 4 (Reading Day) for a groundbreaking ceremony to celebrate the start of construction on the new engineering design, integration and prototyping studio at the Engineering Center, the next step in eSpace—a collective investment in innovative, hands-on learning spaces for Fulton Engineering students.

Paul Johnson and Jim Collefello will speak about the vision for the eSpace initiative.

Construction started on March 30. Beginning in fall 2011, the lab portion of our FSE 100 classes will be scheduled in this new eSpace.

DATE: Wednesday, May 4, 2011

TIME: 2:30 – 3: 00 p.m.

PLACE: Outside Engineering Center G-wing

More information: new.engineering.asu.edu/espace

Comments are closed.

  • Features

  • Follow us on Twitter

  • Fulton Engineering on Social Media

  • In the Loop

    In the Loop is an online news site for the faculty and staff of the Fulton Schools of Engineering at ASU.